Process Sequence of Sewing Department in Garments Industry

Process Sequence of Sewing Department in the Garments Industry

The sewing section is the main department in the garments manufacturing industry.  After completing the garment cutting, all the cutting parts are received in the sewing department. In this department, different parts are joined together with the help of varying sewing machines, threads, and needles. To complete the garment efficiently and in a timely manner, the floor in charge of the sewing department maintains a working procedure. The working procedure is also known as the process flow chart of the sewing department in the garments industry. We present the Process Sequence of the Sewing Department in the Garments Industry in this article.

The working process of the sewing department in the apparel industry is a process flow chart according to the operation breakdown. Nowmarl workflow chart in the process is Small parts→Front Part→Back Part→Assembly→Output→ Next process. Throughout the process, efficient workflow management, skilled labor, proper machine maintenance, and strict quality control measures are essential to ensure the timely delivery of high-quality garments.

Process Sequence of Sewing Department in Garments Industry

Process Flowchart for Garments Sewing Department:

How does the sewing department work? Working procedures or process sequences of the sewing department in the apparel industry are given below with a table…

Process Sequence of Sewing Department in the Garments Industry
Planning      →1Garments Analysis, QC file and Raw Material Receiving
2Target setup for production Planning (On the basis of shipment schedule)
3Setup Machine Layout as per Operation Breakdown
4Setup Operator Layout as per Operation Breakdown
5Quality control of product
Layout        →1Line Balancing to control WIP and remove bottlenecks.
2Line Setup (Advance or normal)
3Process Distribution
Sewing        →1Garment parts are received from the cutting dept.
2All the garment parts are stored/ racking carefully.
3Garment cutting parts distribution to the operator
and helper
4Position mark to components where required
5Parts making (Individual)
6In-line quality checking/ inspection
7Parts assembling
8In-line quality audit
9Output garments are counted and checked with the
target.
10End-line quality audit
11Table Inspection (After completing the table inspection
quality passed garments are sent to the finishing department)
Preparation
for Finishing Department
 Thread removing, Quality check, Ironing or pressing, Garments measurement, poly, Label attached, Packaging, etc.

Conclusion

Sewing operation has many stitching processes, and this Process Sequence of the Sewing Department has explained everything about it.

Process Sequence of Sewing Department in Garments Industry

Leave a Reply

Scroll to top